JP02 Tied Rubber Bellows

Specification

Tied E.P.D.M. rubber bellows with synthetic fibre reinforced body and steel reinforced collar. Fitted with zinc plated carbon steel swivel flanges. Drilled to BS. 4504 NP16.

Application

Stourflex tied rubber bellows are designed to reduce noise and vibration imposed on pipework from pumps and reciprocating machinery. They are suitable for L.T.H.W. & C.H.W applications (please see the Stourflex chemical compatibility chart for a full list of suitable flow media).

Maximum cold test pressure = 1.5 x working pressure or 1.5 x flange rating, whichever the lower.

Maximum Pressure & Temperatures

Up to 90°c6 Bar
Up to 82°c10 Bar
Up to 70°c16 Bar

Lagging

Stourflex are now able to offer a tailor made flexible lagging jacket to help reduce heat gains & condensation on CHW systems. Please ask for more information.

*We would not recommend the insulation of rubber bellows being used on hot water or heating applications as this can drastically reduce the life expectancy of the bellows leading to premature failure.

Download data sheet Buy product
JP02 rubber bellows

our technical specifications

Our JP02 Tied Rubber Bellows specifications

Part numberN.B.Installed LengthTie BarsLateral
JP02-25-1625130213
JP02-32-1632130213
JP02-40-1640130213
JP02-50-1650130213
JP02-65-1665130213
JP02-80-1680130213
JP02-100-16100130213
JP02-125-16125130213
JP02-150-16150130213
JP02-200-16200130213
JP02-250-16250130213
JP02-300-16300130413

Supplied length may vary, manufacturing tolerance +/-5%

For sizes above 300mm N.B. please refer to the JP04 tied rubber bellows.

Where vacuum conditions or pressures and temperatures above those stated exist, please check with us the suitability of and effects on service life of Stourflex products.

Alternative flange drillings and materials are available on request.

Stourflex products should be installed in accordance with our fitting instructions.

Stourflex rubber bellows should be regularly inspected as part of normal system maintenance and replaced immediately if any deterioration is evident. For more information, please contact Stourflex about a site survey.