Call us today on: (+44) 01384 393329

Take a look through our latest projects

Stourflex has provided pipeline solutions for many of the most significant construction projects seen in the UK in recent years. Our case studies provide a flavour of our business, expertise and capabilities.
FEATURED
Find Case Studies by category :
Projects checkbox filter
Stourflex supported the £1 billion Kidbrooke Village regeneration with specialist thermal expansion design, supplying tailored joints and settlement solutions, anchor force calculations, and on-site engineering support across multiple project phases.
Stourflex partnered with Imtech (Dalkia) on the prestigious heating system renovation of the Grade I listed Houses of Parliament, delivering bespoke expansion solutions to overcome complex structural, spatial, and logistical challenges.
Addenbrookes Case Study
Working with MTX on the new Cambridge Movement Surgical Hub at Addenbrooke’s Hospital, our team delivered bespoke rooftop support systems, installation services, and protective solutions to ensure compatibility with the Firestone roof membrane.
Birmingham council case study
As part of the £65m 3 Arena Central development in Birmingham, our team designed and supplied thermal expansion solutions, rooftop supports, and installation services, with continued after-sales support and site visits.
9 Elms case study
In the transforming Nine Elms district, our team worked with Ark M&E to design and supply a combination of screwed and flanged expansion joints, alongside bespoke anchors and guides for complex pipe risers and floors.
JLR case study
Interserve engaged our team for expertise in vibration and noise reduction, air dirt removal, and water treatment at the £550m JLR i54 plant in Wolverhampton, designed to produce an engine every 36 seconds.
Stourflex supplied pump connectors to support the mechanical services for Birmingham’s iconic £189m Library, helping manage noise and vibration across the building’s HVAC systems.
Uni Hertfordshire Case Study
Hertfordshire University’s new student accommodation campus in Hatfield is part of the University’s vision to enhance students’ lives by creating a fully inclusive living and learning campus environment. Stourflex were contacted by Kane Group to accommodate the thermal expansion for the building.    
Bankside Case Study
A 390,000 sq ft residential scheme and comprises 217 homes in buildings ranging from 12 to 24 storeys.
375 Kensington High Street is a flagship development by St Edward, offering a range of high specification one, two and three bedroom apartments and penthouses.
As part of reactor drain modifications at Wylfa Power Station, our team designed and manufactured stainless steel expansion joints with a bespoke composite liner, ensuring safe angulation and preventing contaminated material from collecting within the system.
For this highly complex project, our team delivered a tailored high-pressure steam expansion solution, providing verified anchor-force calculations and innovative Sikla Simotec Ultraglide support systems to minimise structural impact on existing brickwork, floors and walls.
Working with Lorne Stewart on this landmark Grade II listed tower, our team designed a tailored expansion solution, combining axial and lateral joints with compatible anchors and guides to suit the high-pressure stainless steel refurbishment.
At The Macallan distillery, our team supported Forsyth by providing angular and lateral expansion joints, accommodating the unique outward growth of circular steam and condensate pipework alongside straight pipe connections.
At Airbus Broughton, our team worked with NG Bailey to design and supply bespoke rooftop support systems for AHUs and chillers, overcoming tight roof space and pitch constraints through a tailored engineered configuration.
Stourflex partnered with T Clarke on London’s iconic The Shard, supplying high-performance rubber bellows to provide vibration isolation for critical pump systems, helping ensure reliable operation, reduced noise transmission and enhanced mechanical services performance throughout the landmark development.