Stourflex were proud to support the development of 3 Arena Central (3 AC), one of ten landmark buildings being constructed within Birmingham’s Arena Central regeneration scheme. The £65 million development provides approximately 240,000 sq ft of Grade A commercial office space across the ground floor and 13 upper levels, contributing to the transformation of Birmingham’s city centre business district.
Stourflex were initially contacted to assess and accommodate the thermal expansion requirements of the building’s mechanical services pipework. Following receipt of the pipework layout drawings, our engineering team developed a comprehensive expansion design incorporating JP113 and JP116VS axial expansion joints, together with JP150 slide guides and JP172 channel anchors. To further enhance system performance, Stourflex also supplied JP02 rubber bellows to isolate vibration generated by the pump installations and prevent transmission throughout the pipework network.
During the pipework design phase, Stourflex identified an opportunity to assist with the rooftop plant support requirements. Following discussions with Dodd Group, our team was invited to undertake a detailed site survey to review the proposed plant arrangements and installation constraints. During this process, the mechanical plant requiring support was assessed and a range of suitable support solutions was proposed, including standard frames, heavy-duty frames and bespoke I-beam support structures. To provide a complete solution, Stourflex also offered a full installation service for the rooftop support systems.
Once the design drawings and structural load calculations had been reviewed and approved, an order was placed for the manufacture, supply and installation of the rooftop support framework. The combination of thermal expansion expertise, vibration control products and bespoke support solutions enabled Stourflex to provide a coordinated approach to the project’s mechanical services requirements.
Following project completion, Stourflex continued to support the development through our after-sales service, undertaking additional site visits to review both the rooftop support installations and the pipe expansion systems. This ongoing involvement ensured that the solutions performed as intended and reinforced our commitment to delivering long-term value to our customers.
Stourflex were delighted to work alongside Dodd Group on this prestigious Birmingham development and proud to contribute to a project that forms part of one of the city’s most significant commercial regeneration schemes.
Talk to our experts about your project, completely obligation-free.
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Vimeo is a video hosting platform for high-quality content, ideal for creators and businesses to showcase their work.
Service URL: vimeo.com (opens in a new window)