Call us today on: (+44) 01384 393329

Centre Point

Centre Point

Overview

The building is 117 m (385 ft) high, has 34 floors and 27,180 m2 (292,563 sq ft) of floor space. Constructed from 1963 to 1966, it was one of the first skyscrapers in London, and as of 2009 was the city’s joint 27th-tallest building. It stood empty from the time of its completion until 1975, and was briefly occupied by housing activists in 1974. Since 1995 it has been a Grade II listed building. In 2015 it was converted from office space to luxury flats.

Lorne Stewart contacting Stouflex to provide an expansion design. With the project being a refurbishment it gave some unique challenges with the high pressure, thin wall Stainless Steel pipe. Stourflex used a combination of Axial and Lateral Expansion with the Anchors and Guides to suit.

 

Need help with an upcoming project?

Book a free consultation

Talk to our experts about your project, completely obligation-free.

Products used

JP116VS Flanged Axial Expansion Joint

JP116VS Axial Expansion Joint Flanged

Introducing the JP116VS Axial Expansion Joint Flanged – engineered with stainless steel 321 bellows and carbon steel zinc-plated flanges for superior durability. Designed to deal with axial movement in pipework up to 120ºC, now available with custom flexible lagging jackets to enhance thermal efficiency.
JP121 Lateral Expansion Joint Flanged

JP121 Lateral Expansion Joint Flanged

Meet the JP121 Lateral Expansion Joint Flanged—crafted with double-tied stainless steel bellows and zinc-plated carbon steel van-stone flanges, giving stainless steel contact to all wetted parts, for superior durability. Designed to absorb lateral pipe movements in hot water, oil, steam and gases up to 300ºC. Now with precision-fit flexible lagging jackets to enhance thermal efficiency.
JP170 Suspended Pipe Anchor

JP170 Suspended Pipe Anchor

Meet the JP170 Suspended Pipe Anchor: a durable, electro-galvanized carbon steel clamp with 4 angular braces and fixing kit. Designed for secure fixed points in expansion joint installations, it supports loads from 5kN to 35kN and suits ceiling, floor and wall-mounted pipework.
JP150 Expansion Joint Slide Guides

JP150 Expansion Joint Guides

Experience superior pipe movement control with JP150 Expansion Joint Guides. Made from electro-galvanised carbon steel with low-friction slide assemblies, they prevent buckling and reduce anchor forces. Versatile mounting, multiple finishes, and up to 250°C operation for reliable, long-lasting performance.

Latest Projects

Uni Hertfordshire Case Study
Hertfordshire University’s new student accommodation campus in Hatfield is part of the University’s vision to enhance students’ lives by creating a fully inclusive living and learning campus environment. Stourflex were contacted by Kane Group to accommodate the thermal expansion for the building.    
Stourflex supplied pump connectors to support the mechanical services for Birmingham’s iconic £189m Library, helping manage noise and vibration across the building’s HVAC systems.
At Airbus Broughton, our team worked with NG Bailey to design and supply bespoke rooftop support systems for AHUs and chillers, overcoming tight roof space and pitch constraints through a tailored engineered configuration.
Stourflex partnered with T Clarke on London’s iconic The Shard, supplying high-performance rubber bellows to provide vibration isolation for critical pump systems, helping ensure reliable operation, reduced noise transmission and enhanced mechanical services performance throughout the landmark development.
At Airbus Broughton, our team worked with NG Bailey to design and supply bespoke rooftop support systems for AHUs and chillers, overcoming tight roof space and pitch constraints through a tailored engineered configuration.
At The Macallan distillery, our team supported Forsyth by providing angular and lateral expansion joints, accommodating the unique outward growth of circular steam and condensate pipework alongside straight pipe connections.
Working with Lorne Stewart on this landmark Grade II listed tower, our team designed a tailored expansion solution, combining axial and lateral joints with compatible anchors and guides to suit the high-pressure stainless steel refurbishment.
For this highly complex project, our team delivered a tailored high-pressure steam expansion solution, providing verified anchor-force calculations and innovative Sikla Simotec Ultraglide support systems to minimise structural impact on existing brickwork, floors and walls.