Call us today on: (+44) 01384 393329

Jaguar Land Rover, Wolverhampton

Jaguar Land Rover

Overview

Stourflex were contacted by Interserve Engineering Services to provide specialist expertise in anti-vibration and noise reduction, air and dirt separation, and water treatment solutions for the new Jaguar Land Rover i54 Engine Manufacturing Centre in Wolverhampton. Representing an investment of £550 million, the state-of-the-art facility was developed to support Jaguar Land Rover’s future engine production requirements and is capable of producing an engine every 36 seconds when operating at full capacity.

Given the scale and importance of the facility, ensuring the efficient and reliable operation of the building services systems was critical. The high-performance manufacturing environment demanded carefully engineered solutions to minimise vibration and noise transmission throughout the mechanical systems, while also maintaining optimum water quality and system efficiency. Effective air and dirt removal was essential to protect plant equipment, maximise operational performance and reduce long-term maintenance requirements.

Working closely with Interserve, Stourflex supplied a range of specialist products designed to meet the demanding requirements of the project. Anti-vibration and noise reduction solutions were incorporated to protect equipment and improve system performance, while air and dirt separation equipment was specified to maintain clean, efficient system operation. Complementing these measures, water treatment solutions were provided to help safeguard the integrity and longevity of the mechanical services infrastructure throughout the facility.

Stourflex were proud to contribute to such a significant manufacturing development and to support Interserve Engineering Services on a project that plays an important role in the future of UK automotive production. The opportunity to be involved in a facility of this scale and technological importance is one that we are delighted to have been part of.

Need help with an upcoming project?

Book a free consultation

Talk to our experts about your project, completely obligation-free.

Products used

JP750 Stainless Steel

JP750 Stainless Steel

Introducing the JP750 Stainless Steel Chemical Dosing Pot – a durable, fatigue-resistant vessel designed for seamless chemical dosing without system shutdown. Available in multiple sizes, it features a versatile left/right installation and meets BSRIA BG50/2021 standards for optimal performance and safety.
JP603 Air and Dirt Separator Flanged

JP603 Air and Dirt Separator Flanged

Introducing the JP603 Air and Dirt Separator Flanged – a robust carbon steel unit with stainless steel diffuser, designed to efficiently remove air and dirt from heating and chilled water systems. Features automatic air venting, manual sludge drainage, and durable RAL 9006 finish. Max temp 95ºC.
JP20BS Stainless Steel Screwed Pump Connector

JP20BS Stainless Steel Screwed Pump Connector

Meet the JP20BS Stainless Steel Screwed Pump Connector: built with durable grade 321 convoluted hose and 316 B.S.P.T male ends, it reduces noise and vibration in pump systems. Rated for up to 120ºC, it’s perfect for chilled water, L.T.H.W, M.T.H.W, oil and gasses.
JP02 Tied EPDM Rubber Bellows

JP02 Tied Rubber Bellows

Discover the JP02 Tied Rubber Bellows—durable EPDM rubber with synthetic fiber reinforcement and steel collars, fitted with zinc-plated swivel flanges to BS 4504 NP16 standards. Designed to reduce noise and vibration in pipework, is suitable for up to 90°C temperature, ideal for L.T.H.W. & C.H.W. systems.

Latest Projects

As part of reactor drain modifications at Wylfa Power Station, our team designed and manufactured stainless steel expansion joints with a bespoke composite liner, ensuring safe angulation and preventing contaminated material from collecting within the system.
Working with Lorne Stewart on this landmark Grade II listed tower, our team designed a tailored expansion solution, combining axial and lateral joints with compatible anchors and guides to suit the high-pressure stainless steel refurbishment.
Stourflex supplied pump connectors to support the mechanical services for Birmingham’s iconic £189m Library, helping manage noise and vibration across the building’s HVAC systems.
Stourflex partnered with T Clarke on London’s iconic The Shard, supplying high-performance rubber bellows to provide vibration isolation for critical pump systems, helping ensure reliable operation, reduced noise transmission and enhanced mechanical services performance throughout the landmark development.
At Airbus Broughton, our team worked with NG Bailey to design and supply bespoke rooftop support systems for AHUs and chillers, overcoming tight roof space and pitch constraints through a tailored engineered configuration.
At The Macallan distillery, our team supported Forsyth by providing angular and lateral expansion joints, accommodating the unique outward growth of circular steam and condensate pipework alongside straight pipe connections.
Working with Lorne Stewart on this landmark Grade II listed tower, our team designed a tailored expansion solution, combining axial and lateral joints with compatible anchors and guides to suit the high-pressure stainless steel refurbishment.
For this highly complex project, our team delivered a tailored high-pressure steam expansion solution, providing verified anchor-force calculations and innovative Sikla Simotec Ultraglide support systems to minimise structural impact on existing brickwork, floors and walls.