Stourflex were engaged by a number of contractors across multiple phases of the Kidbrooke Village development, one of London’s most significant regeneration projects. Located within the Royal Borough of Greenwich, the £1 billion scheme is transforming the area into a vibrant new community in partnership with the Royal Borough of Greenwich and the Mayor of London. Featuring award-winning green spaces and extensive residential development, Kidbrooke Village is set to deliver more than 5,000 new homes by 2030, creating a thriving and sustainable neighbourhood for future generations.

The scale of the development and the phased nature of the construction programme presented a variety of engineering challenges. Extensive underground ring mains, multiple building risers and varying structural arrangements required a carefully coordinated approach to thermal expansion management. In addition, several areas of the project required accommodation for building settlement movements, creating further complexity within the overall expansion design.

Drawing on our specialist expertise, Stourflex provided comprehensive thermal expansion design services throughout the project. Working closely with the various contractors and project teams, we engineered solutions incorporating a range of axial, lateral and single-hinged angular expansion joints to suit the differing pipework configurations encountered across the development. To address the unique structural movement requirements, Stourflex also designed and supplied an innovative series of building settlement joints, arranged in a complex configuration to accommodate site-specific conditions while maintaining system integrity.

In addition to supplying the expansion joints, Stourflex provided detailed anchor force calculations to support the design and ensure that all associated pipework supports and restraints were correctly specified. Our involvement extended beyond product supply, with technical guidance provided on installation methods, support arrangements and best practice throughout the construction process. Products were manufactured and delivered in accordance with the clients’ construction schedules to support the phased delivery of the development.

The success of the project was supported by regular site visits carried out during the design, engineering and installation stages, allowing our team to work closely with contractors and resolve challenges as they arose. This hands-on approach continued through to final inspection and sign-off, ensuring that the completed systems performed in accordance with the design requirements.

Stourflex were delighted to play a role in the delivery of such a transformative development and proud to support the creation of a new London community that will provide high-quality homes and green spaces for thousands of residents for many years to come.

Conclusion:

 

 

Need help with an upcoming project?

Book a free consultation

Talk to our experts about your project, completely obligation-free.

Products used

JP116VS Flanged Axial Expansion Joint

JP116VS Axial Expansion Joint Flanged

Introducing the JP116VS Axial Expansion Joint Flanged – engineered with stainless steel 321 bellows and carbon steel zinc-plated flanges for superior durability. Designed to deal with axial movement in pipework up to 120ºC, now available with custom flexible lagging jackets to enhance thermal efficiency.
JP120 Flanged Lateral Expansion Joint

JP120 Lateral Expansion Joint Flanged

Introducing the JP120 Lateral Expansion Joint Flanged – a durable, double-tied joint with stainless steel bellows and carbon steel flanges, designed for precise lateral movement in piping systems. Suitable for hot water, steam, oil and gasses up to 300ºC. Now available with custom flexible lagging jackets to reduce heat loss and condensation.
JP150 Expansion Joint Slide Guides

JP150 Expansion Joint Guides

Experience superior pipe movement control with JP150 Expansion Joint Guides. Made from electro-galvanised carbon steel with low-friction slide assemblies, they prevent buckling and reduce anchor forces. Versatile mounting, multiple finishes, and up to 250°C operation for reliable, long-lasting performance.
JP172 Channel Pipe Anchor

JP172 Channel Anchor

Introducing the JP172 Channel Anchor – a compact, high-strength pipe anchor featuring a two-part fixed clamp and corrosion-resistant carbon steel channel. Suitable for loads up to 35kN, with powder coated and stainless steel options for copper and stainless pipes. Perfect where space is tight!

Latest Projects

Addenbrookes Case Study
Working with MTX on the new Cambridge Movement Surgical Hub at Addenbrooke’s Hospital, our team delivered bespoke rooftop support systems, installation services, and protective solutions to ensure compatibility with the Firestone roof membrane.
For this highly complex project, our team delivered a tailored high-pressure steam expansion solution, providing verified anchor-force calculations and innovative Sikla Simotec Ultraglide support systems to minimise structural impact on existing brickwork, floors and walls.
Stourflex partnered with Imtech (Dalkia) on the prestigious heating system renovation of the Grade I listed Houses of Parliament, delivering bespoke expansion solutions to overcome complex structural, spatial, and logistical challenges.
Stourflex partnered with T Clarke on London’s iconic The Shard, supplying high-performance rubber bellows to provide vibration isolation for critical pump systems, helping ensure reliable operation, reduced noise transmission and enhanced mechanical services performance throughout the landmark development.
At Airbus Broughton, our team worked with NG Bailey to design and supply bespoke rooftop support systems for AHUs and chillers, overcoming tight roof space and pitch constraints through a tailored engineered configuration.
At The Macallan distillery, our team supported Forsyth by providing angular and lateral expansion joints, accommodating the unique outward growth of circular steam and condensate pipework alongside straight pipe connections.
Working with Lorne Stewart on this landmark Grade II listed tower, our team designed a tailored expansion solution, combining axial and lateral joints with compatible anchors and guides to suit the high-pressure stainless steel refurbishment.
For this highly complex project, our team delivered a tailored high-pressure steam expansion solution, providing verified anchor-force calculations and innovative Sikla Simotec Ultraglide support systems to minimise structural impact on existing brickwork, floors and walls.