Call us today on: (+44) 01384 393329

The New Library of Birmingham

Birmingham City Council

Overview

Stourflex were selected to support the mechanical services for the Library of Birmingham, one of the most significant public buildings constructed in the UK in recent years. Opened to the public in September 2013, the £189 million development houses a collection of over one million books and features more than 200 public access computers, theatres, exhibition galleries, music rooms and a wide range of community and cultural facilities.

As a landmark civic building designed to welcome large numbers of visitors, the project demanded reliable and efficient building services systems with a focus on eliminating the noise and vibration. The complexity of the mechanical infrastructure, combined with the need to ensure long-term performance, required carefully engineered solutions to accommodate noise and vibration, minimise system stresses and contribute to the overall efficiency of the installation.

Working closely with the project team, Stourflex supplied specialist products designed to support the safe and reliable operation of the building’s mechanical services systems. Our expertise helped ensure that the noise and vibration were effectively managed throughout the pipework, contributing to the longevity and performance of the installation.

Stourflex were delighted to play a part in the delivery of such an iconic public building. The Library of Birmingham has become a cultural landmark for the city, and we are proud to have contributed to a project that continues to serve millions of visitors and support learning, culture and community engagement across the region.

Need help with an upcoming project?

Book a free consultation

Talk to our experts about your project, completely obligation-free.

Products used

JP23VS Tied Stainless Steel Flanged Pump Connector

JP23VS Tied Stainless Steel Flanged Pump Connector

Introducing the JP23VS Tied Stainless Steel Flanged Pump Connector—crafted with durable stainless steel 321 bellows and zinc-plated carbon steel flanges. Designed to reduce noise and vibration, it handles temps up to 300ºC with versatile washer options.
JP20BS Stainless Steel Screwed Pump Connector

JP20BS Stainless Steel Screwed Pump Connector

Meet the JP20BS Stainless Steel Screwed Pump Connector: built with durable grade 321 convoluted hose and 316 B.S.P.T male ends, it reduces noise and vibration in pump systems. Rated for up to 120ºC, it’s perfect for chilled water, L.T.H.W, M.T.H.W, oil and gasses.

Latest Projects

Stourflex partnered with T Clarke on London’s iconic The Shard, supplying high-performance rubber bellows to provide vibration isolation for critical pump systems, helping ensure reliable operation, reduced noise transmission and enhanced mechanical services performance throughout the landmark development.
Uni Hertfordshire Case Study
Hertfordshire University’s new student accommodation campus in Hatfield is part of the University’s vision to enhance students’ lives by creating a fully inclusive living and learning campus environment. Stourflex were contacted by Kane Group to accommodate the thermal expansion for the building.    
Addenbrookes Case Study
Working with MTX on the new Cambridge Movement Surgical Hub at Addenbrooke’s Hospital, our team delivered bespoke rooftop support systems, installation services, and protective solutions to ensure compatibility with the Firestone roof membrane.
Stourflex partnered with T Clarke on London’s iconic The Shard, supplying high-performance rubber bellows to provide vibration isolation for critical pump systems, helping ensure reliable operation, reduced noise transmission and enhanced mechanical services performance throughout the landmark development.
At Airbus Broughton, our team worked with NG Bailey to design and supply bespoke rooftop support systems for AHUs and chillers, overcoming tight roof space and pitch constraints through a tailored engineered configuration.
At The Macallan distillery, our team supported Forsyth by providing angular and lateral expansion joints, accommodating the unique outward growth of circular steam and condensate pipework alongside straight pipe connections.
Working with Lorne Stewart on this landmark Grade II listed tower, our team designed a tailored expansion solution, combining axial and lateral joints with compatible anchors and guides to suit the high-pressure stainless steel refurbishment.
For this highly complex project, our team delivered a tailored high-pressure steam expansion solution, providing verified anchor-force calculations and innovative Sikla Simotec Ultraglide support systems to minimise structural impact on existing brickwork, floors and walls.